Wakulla, 2000-06-23, Landon, Lennon, MacElhannon

WKPP Update, June/July/August 2000

Wakulla, 2000-06-23, Landon, Lennon, MacElhannon

WKPP_reports

WKPP

Date 2000-06-23
Site Wakulla Springs
Team Scott Landon, David Lennon, Skip MacElhannon
Objective Check system conditions to 2200 feet in A tunnel for next day’s operation.
Logistics Single stage with tow scooter. No backgas used.
Bottom Time 25
Maximum Depth 288
Results Checked visibility in A tunnel and at the D/F entrance. Checked visibility past 2200 drop out to the Lamar bottle to ensure that clear cave was not only a function of D tunnel flow.