Wakulla, 2000-06-10, LeVake, Lennon

WKPP Update, June/July/August 2000

Wakulla, 2000-06-10, LeVake, Lennon

WKPP_reports

WKPP

Date 2000-06-10
Site Wakulla
Team LeVake, Lennon
Objective Drop 190 bottle, replace flow sensor
Logistics Single stage, one scooter per diver.
Bottom Time 20 minutes
Maximum Depth 199 FFW
Results Dropped the 190 stage at the first 190 drop. Removed the old flow sensor and replaced it with the new one. None of the hardware was corroded. We noticed an unusually large number of eels present in the deep cavern/cave entrance zone.