Wakulla, 2000-06-04, Irvine, Porceddu

WKPP Update, June/July/August 2000

Wakulla, 2000-06-04, Irvine, Porceddu

WKPP_reports

WKPP

Date 2000-06-04
Site Wakulla Springs
Team Irvine, Porceddu
Objective Check visibility out A tunnel and check the survey from D tunnel back to the entrance.
Logistics single stage, double scooter, the usual gasses for 300, 190, 120, 70, and oxygen.
Bottom Time 26 min.
Maximum Depth 292′
Results Rode out A tunnel which had wall to wall vis all the way past D tunnel. On the way we checked L tunnel (clear), F tunnel (clear), D tunnel, and on the way back we checked E tunnel as well as C and B tunnel. Only B is showing any flow. A is siphoning from B on back. Cave is ready for exploration. The line installed by the USDCT was not knotted so we had to survey Exley