Wakulla, 2000-04-29, Jablonski, Irvine

WKPP Update, Spring 2000

Wakulla, 2000-04-29, Jablonski, Irvine


WKPP_reports

WKPP





































Date 2000-04-29
Site Wakulla Springs
Team Jarrod Jablonski and George Irvine
Objective Push side leads located in excess of 15k
Logistics Halcyon breahter with two drive bottles 10/85, 5 gavins, EE HID with Nicad
Bottom Time 130min
Maximum Depth 300
Results Visibility in Wakulla Springs was greatly declined. Following the line was not particularly difficult but choosing the proper leads is more difficult and time is better invested with clear water where it is more reasonable to establish connection tunnels and evaluate flow, surface water intrusion, sediment, paleoflow conditions and the like. Jablonski and Irvine called the dive at 8k choosing to save exploration for more effective exposures.