Cheryl Sink, 1999-12-12, Landon, Gol, Lennon

WKPP dive reports – December 1999/January 2000

Cheryl Sink, 1999-12-12, Landon, Gol, Lennon

WKPP_reports

WKPP

Date 1999-12-12
Site Cheryl
Team Scott Landon Jonathon Gol David Lennon
Objective Line maintenance. Look for potential leads in system.
Logistics Single stage, single scooter.
Bottom Time 45
Maximum Depth 199
Results Proceeded downstream from Emerald Sink to past the midway point to Clearcut Sink. Repaired line and completed line maintenance to get line out of silt on floor. Examined side tunnels and looked for potential leads.